- Production planning Development of a metric system for complaint management (MeSys) 01/2009 – 12/2010 | IGF/FQS
- Automation, Factory planning Automated support for layout selection and configuration of chained production systems at the stage of rough planning (AutoKon) 10/2012 – 09/2014 | IGF/GFaI
- Industry 4.0 Increase of maintenance quality through machine-specific information using the example of the paper processing industry (Digitale Maschinenakte) 05/2008 – 06/2010 | IGF/FQS
- Production planning, Ecology Energy cost-oriented production scheduling (EnKoBel) 08/2011 – 07/2013 | IGF/BVL
- Forming technology, Artificial Intelligence Increase of the overall equipment effectiveness of sheet metal forming by computational experience recovery (ESTER) 02/2010 – 04/2012 | IGF/EFB/GFaI
- Industry 4.0, Forming technology Mechanisms to regulate a variable flash land and their impact on die filling in respect to deviations in die wear and billets' volume within closed die forging process (Gesteuerte Gratbahn) 08/2011 – 07/2013 | DFG
- Tool- and Mold-Making, Automation, Artificial Intelligence Automated positioning of cooling channels by using methods of artificial intelligence (NeuroTemp) 07/2009 – 07/2011 | ZIM
- Artificial Intelligence, Industry 4.0 Quality system for the evaluation of 8D report contents (QuSys) 11/2014 – 10/2016 | IGF/GFaI
- XXL products, Ecology, Artificial Intelligence Increase of reliability of condition prognosis of offshore wind turbines by using data mining algorithms (SteigProg) 07/2010 – 06/2012 | MW/MWK
- Process design, Tool- and Mold-Making, Forming technology, Artificial Intelligence Design of optimal pre-form stages for flashless forging of long flat parts using stochastic optimization methods (Vorformoptimierung) 08/2007 – 01/2010 | DFG
- Tool- and Mold-Making, Forming technology, Artificial Intelligence, Process design Design of optimal pre-form stages of forging parts using stochastic optimization methods (Vorformoptimierung Transferprojekt) 01/2015 – 05/2016 | DFG
- Artificial Intelligence, Forming technology AI based prediction of the results of bulk forming simulations (KImulation) 04/2015 – 03/2018 | DFG
- Production planning Regulated demand fulfillment strategies for spare parts (GET) 01/2008 – 03/2010 | IGF/BVL
- XXL products, Ecology Model based development of disassembly network design for large-scale products (DemoNetXXL) 01/2016 – 12/2017 | DFG
- Industry 4.0 Development of a maturity model to improve industry 4.0 competences in production and logistics using the example of interactive assistance systems (4.0-Ready) 12/2015 – 01/2018 | IGF/BVL
- Production planning Evaluation and application of work load flexibility for aligning capacity needs to capacity offers in production processes (Belastungsflexibilität) 01/2013 – 12/2014 | DFG
- Production planning Logistics Concepts for Versatile Assembly Systems (LoWaMos) 03/2009 – 01/2011 | IGF/BVL
- XXL products, Production planning Supply Chain Design for XXL products (XXL-SCD) 10/2011 – 09/2013 | MW/MWK
- Factory planning, Artificial Intelligence Quantitative multidimensional ad hoc factory evaluation by mathematical modeling of factory planning relevant characteristics (QuaMFaB) 05/2015 – 03/2017 | IGF/BVL
- Forming technology Ceramic-steel bonds for adhesion reduction in aluminum forging (ALDi) 07/2009 – 06/2011 | DFG