| Theme | Ecology, XXL products |
|---|---|
| Project title | Design of the Port Layout for the Efficient Decommissioning and Dismantling of Offshore Wind Turbines (HOWEARD) |
| Project duration | 01.11.2026 – 31.10.2028 |
Starting in 2030, a major wave of decommissioning is expected for offshore wind turbines, as the first turbines reach the end of their 20-year operational life. Decommissioning requires specialized ships that act as coordinators, determining how many components arrive at a port and when. According to the SeeOff study, decommissioning is expected to involve approximately 70 to 80 turbines per year. The delivered components must be disassembled, shredded, and transported away at the port. However, available port space is a scarce resource.
The goal of the HOWEARD research project is to develop design guidelines for the planning and operation of layout areas within the port premises for the dismantling and shredding of offshore wind turbines. To this end, the factors influencing area design and the dismantling process will be identified, discussed, and evaluated by a panel of experts.
Based on this, a method will be developed to determine functional areas within the port depending on the disassembly depth and to arrange them dynamically. The disassembly depth determines which activities take place on the port premises and thus significantly determines the space requirements. The optimization problem arising from disassembly planning and dynamic layout planning is solved using a heuristic method.