- Ecology, Production planning Development of a method for the quantification of decision-relevant ecological and logistics costs for the design of delivery concepts (Öko-Anlieferkonzepte) 11/2012 – 01/2015 | AiF/BVL
- Automation, Factory planning Automated support for layout selection and configuration of chained production systems at the stage of rough planning (AutoKon) 10/2012 – 09/2014 | AiF/GFaI
- Tool- and Mold-Making, Forming technology, Ecology Resource efficient forging process chain for complicated high duty parts (REForCh) 10/2012 – 09/2014 | EU: 7th Framework Programme
- XXL products, Production planning Identification of the limits of the flow production for XXL-production and transmission of selected benefits from flow- to on the site Production (Fließfertigung in der XXL-Produktion) 07/2012 – 06/2014 | AiF/BVL
- XXL products, Production planning Developing a simulation-based methodology for multi-site assembly control (BauSim) 05/2012 – 09/2015 | DFG
- Industry 4.0 Intelligent grinding tool – follow-up (IW 2) 02/2012 – 01/2013 | DFG
- XXL products, Production planning Key performance indicators to evaluate material availability for the assembly of large scaled products (MatKenn) 01/2012 – 12/2013 | MW/MWK
- XXL products, Production planning Supply Chain Design for XXL products (XXL-SCD) 10/2011 – 09/2013 | MW/MWK
- Factory planning, Ecology Energy and material flow efficient factory planning (EnMaFap) 10/2011 – 09/2013 | AiF/BVL
- XXL products Development and systematization of generic principles to support the assembly of large-scale products (XXL-Montagehilfen) 10/2011 – 09/2013 | MW/MWK
- Production planning, Ecology Energy cost-oriented production scheduling (EnKoBel) 08/2011 – 07/2013 | AiF/BVL
- Industry 4.0, Forming technology Mechanisms to regulate a variable flash land and their impact on die filling in respect to deviations in die wear and billets' volume within closed die forging process (Gesteuerte Gratbahn) 08/2011 – 07/2013 | DFG
- Forming technology Flashless forging of aluminum matrix composites (Alu-MMC) 07/2011 – 06/2013 | DFG
- Industry 4.0, Automated guided vehicles, Artificial Intelligence Decentralized, agent-based self-control of automated guide vehicle systems (FTS-Selbststeuerung) 07/2011 – 06/2013 | AiF/BVL
- XXL products Decision support to determine the design (modular or monolithic) of XXL-products on the basis of lifecycle costs (SkalKomp XXL) 07/2011 – 06/2013 | MW/MWK
- Industry 4.0, Automation Automatic identification using visible light communication in intralogistics (IdentOverLight) 05/2011 – 04/2013 | AiF/IFL
- Tool- and Mold-Making, Industry 4.0, Forming technology Intelligent forging tools for the reduction of defects in bulk forming (IWZ) 05/2011 – 04/2013 | AiF/FSV
- Production planning Reduced Costs for Working Capital by Synchronized Material Provision (Kapitalbindung in der Montage) 05/2011 – 02/2013 | AiF/BVL
- XXL products, Production planning Maturity-based development policies for increasing logistics performance in production networks for the production of large-scale products (LORG) 04/2011 – 03/2013 | MW/MWK
- Forming technology Hybrid forging – one-stage forming of sheet and bulk metal parts (Hybridschmieden) 01/2011 – 12/2011 | DFG